Banner
Address FT Site Email CCL Info In Memory Menu Philip Individuals Search Webmaster Content Work Fionn Bob
Information and photographs submitted by subscribers are posted in good faith. If any copyright of anyone else's material is unintentionally breached, please email me


GallerySherwood Colliery (Page 3)


Malcolm Roebuck - I was a Safety Officer at Sherwood Colliery
Page     1    2    3    4 

Sherwood Colliery


Top of the Third Drift Intake looking towards the Manrider Engine (1991)
This shows the Acoustic Barrier constructed to reduce the noise levels to the men waiting to travel inbye.

Inside the Acoustic Barrier; this barrier had an unexpected benefit, not only did it reduce the noise levels by 12dB
It also increased the comfort of the men.
By attaching a door at the outbye end it reduced the velocity of the cold intake air passing through it.

Paul Hubbard (Group Noise Control Engineer) and myself at the inbye end of the acoustic barrier.
This barrier was an idea that I had following the success of a trial elsewhere in the mine; it was constructed of 4"x2" timbers with wood-wool slabs attached to each side, in-filled with rockwool and the outer surface's plastered with hardstop.

 


Top
Pit Terminology - Glossary


Menu

 

Page 1
Memories of Teversal Pit