Banner
Address FT Site Email CCL Info In Memory Menu Philip Individuals Search Webmaster Content Work Fionn Bob
Information and photographs submitted by subscribers are posted in good faith. If any copyright of anyone else's material is unintentionally breached, please email me


Calendar
2015 2010 2000 Time Romans Middle 1500 1600 1700 1734 1800 1830 1860 1900 1920 1930 1940 1950 1960 1970 1980 1990
My Work Diaries

Chimneys

A Unique History From My Work Diaries

Surveying Jobs

No4 Sub-Area, No4 Area, East Midlands Division, NCB from 1st January 1947


Page - 10 -

July 1956

Mon 2 … Technical College   

Tues 3 … Surface … Offset survey in Pit yard … 4 men (WEBB,RB, GB, RE)

Wed 4 … Office … Plotting.

Thurs 5 … Office … Levels.

Fri 6 … Office … R & FF plans.

Sat 7 … Surface … Levelling to top of old Fan drift … 2 men (RB*, RE) Stanley Dumpy.       
Sat 7 … Office … Progress folders.

Sun 8 … Surface … Survey of old Fan drift2 men (WEBB, RB) plus Safety Officer Fred Daft … slimy, wading in the mud to get to a levelling point, held by a rope in case I slipped down the slope … yeuky and dangerous!

Mon 9 … Surface … Subsidence levelling at Skegby Church Hall2 men (RB*, JDeS)

Tues 10 … Office … Subsidence chart of results.

Wed 11 … Office … 1st Waterloo seam sections.

Thurs 12 … Office … Making new Overlay tracings for Top Hard seam.

Fri 13 … Office … Overlay tracings.

Sat 14 … Office … Progress folders.

Mon 16 … Office … Overlay tracings.

Tues 17 … Office … Overlay tracings.

Wed 18 … Office … Overlay tracings.

Thurs 19 … Office … Overlay tracings.

Fri 20U/g40s dial survey and levelling  and face line for new 30s … 3 men (WEBB, RB, JDeS)
Fri 20 … Office … Continued with Overlay tracings.

Sat 21U/g Fatal accident John James Dove 70s LHS benk … 3 men (C Skeavington, WEBB, RB) (Saturday morning, voluntary coaling shift) … following a shot he was crushed by coal whilst crawling back into his stint when his belt was caught on a bent W bar and he couldn’t move.        
(280 + 21 u/g)

Fatal

Annual Leave Mon 20 Aug – Sat 1 Sep … Pit Holidays

Mon 23 … Surface … Subsidence levelling at Skegby 2 men (RB*, RE)

Mon 23 … Office … Top Hard plan.

Tues 24 … Office … Completed Top Hard plan.

Wed 25 … Surface … Levelling from Teversal to Silverhill … 3 men (Percy Hett, RB and George Stafford linesman at Sutton) CTS S400 … Office … Plotting levelling.

Thurs 26U/g60s, 120s, Waterloo and 90s districts dial survey and measurements … 4 men (WEBB, RB, GB, RE)

Fri 27 … Office … Stencilling Titles on plans.

Sat 28 … Office … Progress folders.

Mon 30 … Office … Surface traced on negative.

Aug 1956        

Wed 1 … Office … Top Hard 6 inch to 1 mile tracing.

Thurs 2 … Office … Continued with tracing.

Fri 3 … Office … General.

Sat 4 … Holiday

Mon 6 … Bank Holiday

Tues 7 … Surface … Subsidence levelling at Skegby Church and Hall2 men (RB*, JDeS) S400

Wed 8 … Office … Typing levels.

Thurs 9 … Surface … Dial survey and offsets to fix pithead baths … 3 men (WEBB, RB, RE)

Fri 10 … Office … Typing levels.

Sat 11 … Office … Typing levels.

Mon 13 … Office … Development plan.

Tues 14 … Office … Typing levels.

Wed 15 … Office … Copying surveys.

Thurs 16 … Office … Typing levels.

Fri 17U/g 60s LG theodolite survey angling and measurements … 3 men (WEBB, RB, JDeS)

Annual Leave 2 Weeks Mon Aug 20 – Sat Sep 1

Sat 18 … U/g … Waterloo No2 drift grade line, checked face heading … 3 men (RB*, GB, RE)
Willis Bacon Afternoon Undermanager started

Sep 1956

Mon 3 … Surface … Subsidence levelling at Skegby Hall and Church 2 men (RB*, RE)

Tues 4 … Office … Totalling results of levelling.

Wed 5 … Office … Dunsil / Waterloo plan for Teversal and Glapwell workings.

Thurs 6U/g40s LG theodolite survey and measured with 30m band … 5 men (BT, CB, RB, GB, RE)

Fri 7U/g30s, 90s, Waterloo development, 50s and 60s2 men (RB*, GB) split up - (285 + 21 u/g)

Fri 7 … Office … Totalising levels.

Sat 8 … Office … Progress folders.

Mon 10 … Office … Electrical, Dust Zones, Ventilation and Egress plans.

Tues 11 … Office … Deputy’s Districts. Plan for Glapwell Surveyor.

Wed 12 … Office … Prints off Electrical and Ventilation plans.

Thurs 13 … Office … Ventilation plans.

Fri 14 … Office … Updated Electrical information with Vic Penford U/g Chargeman.

Sat 15 … Office … Electrical plans.

Mon 17 … Office … Notices re shift time amends … 6.30am.

Tues 18 … Technical College ONC

Wed 19 … U/g … Waterloo face heading lines, 40s LG measurements, 100 ft steel band … 3 men (RB*, GB, RE)

Thurs 20 … Office … Electrical plans.

Fri 21 … Office … Electrical plans.

Sat 22 … Office … Progress folders. Totalising levels.

Mon 24 … Office … Totalising levels.

Tues 25 … Technical College

Wed 26 … Office … Levels.

Thurs 27 … Office … Typing sections of coal seams.

Fri 28 … Office … Monthly information.

Sat 29 … Office … R & FF sectional plans.

 

Oct 1956          

Mon 1 … Office … R & FF plans to date.

Tues 2 … Technical College

Wed 3U/gWaterloo face head checked lines, grade line No2 drift … 3 men (WEBB, RB, GB)

Thurs 4 … Surface … Subsidence levelling Teversal Welfare Bowling Green … 3 men (WEBB, RB, GB)

Fri 5U/gProgress measures … 30s, 90s, Waterloo, 50s, 60s2 men (RB*, GB) … split up … 7am – 1pm

Sat 6 … Office … Progress folders. Adjusting CTS 2 minute dial known as the Bomb.

Mon 8 … Surface … Subsidence levelling, checking BMs from Sutton Colliery Ord BM … 2 men (RB*, GB)

Tues 9 … Technical College

Wed 10U/g … 1s face head, extended grade line in No2 head … 2 men (WEBB, RB) … Office … Calculations of coal extraction 

Thurs 11U/g50s LH theodolite survey and measurements … 5 men (WEBB, RB, JDeS, GB, RE) 
(290 + 21 u/g)

Fri 12 … Office … Titles on Top Hard plans.

Sat 13 … Office … Progress folders.

Mon 15 … Office … Assisting WEBB with Top Hard information etc.

Tues 16 … Office … Technical College

Wed 17U/g … Waterloo grade line No2 drift, checked face line in No1 heading … 3 men (WEBB, RB, JDeS)

Thurs 18 … Surface … Subsidence levelling at Skegby Hall and Church2 men (RB*, JDeS)

Fri 19U/g40s dial survey and levelling 2 gates … 4 men (WEBB, RB, CB, JDeS)

Sat 20 … Office … Progress folders. Check calculations.

Mon 22U/g90s RH re-established lines with dial … 2 men (RB*, RE)

Mon 22 … Office … Notice for Canteen.

Tues 23 … Technical College

Wed 24 … Office … General.

Thurs 25U/g60s and 120s dial surveys and measurements 5 gates … 5 men (WEBB, RB, GB, RE, JDeS) 

Fri 26U/g90s all 3 gates and Waterloo dial surveys, and levelling from 90s LH Junction to Waterloo No2 drift … 5 men (WEBB, RB, GB, RE, JDeS) - (295 + 21 u/g)

Sat 27… Bi-annual meeting of Surveyors Bentinck Welfare … Derek Degg, Annesley Correlation.

Mon 29U/g 30s LH face line, established line in 30s LH … 2 men (RB*, RE)

Tues 30 … Technical College

Wed 31 … Office … Survey calculations.

Nov 1956

Thurs 1 … Office … 6 inch Composite plan.

Fri 2 … Office ... Composite plan coloured.

Sat 3 … Office … Progress folders. Checking mean distances between seams.

Mon 5 … Office … Calculation of co-ordinates.

Tues 6 … Technical College

Wed 7 … Office … NMG plan (National Metric Grid)

Thurs 8 … Office … NMG plan.

Fri 9U/g30s both gates and 70s all 3 gates dial surveys and levelling … 5 gates … 4 men (WEBB, RB, CB, JDeS).  This was a typical example of a long shift but as Brian Barlow thought, very rewarding allowing him more time in the office.

Sat 10 … Office … NMG plan and Progress folders.

Mon 12 … Office … NMG plan.

Tues 13 … Technical College

Wed 14U/g Waterloo No2 drift grade line and Face heading line, washout on 90s RH benk … 3 men (WEBB, RB, JDeS)

Thurs 15 … Office … NMG plan.

Fri 16U/g 50s dial survey and levelling 3 gates … 4 men (WEBB, RB, CB, JDeS)

Sat 17 … Office … 50s survey copy and calculations.

Mon 19 … Surface … Subsidence levelling at Skegby Church and Hall2 men (RB*, JDeS)

Tues 20 … Technical College

Wed 21U/gWaterloo No2 drift grade line, face heading line, 90s washout measures … 2 men (WEBB, RB) - (300 + 21 u/g)

Thurs 22 … Office … Progress tracings.

Fri 23 … Surface … to Silverhill for exchange tracings (RB*)

Sat 24 … Office … Progress folders.

Mon 26U/g … 60s DG line check with dial … 2 men (RB*, RE)

Tues 27 … Technical College

Wed 28 … Office … Composite plan.

Fri 30 … Surface … Laying out catenary base line on railway bank … 2 men (BT, RB)

 

Dec 1956

Sat 1 … Office … Progress folders. Monthly info.

Mon 3U/g70s dial surveys and measurements all 3 gates … 4 men (CB, RB, RE, JDeS)

Tues 4 … Technical College

Wed 5 U/g90s washout, Waterloo No2 drift grade line, face heading line2 men (WEBB, RB)

Thurs 6 … Office … Dunsil seam Second copy plans.

Fri 7U/g60s LH dial bases extended survey and measuring … 4 men (WEBB, RB, GB, RE)

Sat 8 … Office … Second copy Working plans plans to date.

Mon 10 … Office … Progress folders. Second copy plan.

Tues 11 … Technical College

Wed 12U/g90s washout, Waterloo No2 drift grade line and centre line, new line for 100s 2 men (RB*, GB) - (305 + 21 u/g)

Fishtail

Thurs 13 … Office … Second copy Working plan.  6 inches to a mile plan.

Fri 14 … Office … Second copy Working plan.

Sat 15 … Office … Progress folders. Levels.

Mon 17 … Office … Typing.

Tues 18 … Technical College

Wed 19U/g90s washout, 1s Waterloo measuring, No2 drift grade line … 2 men (WEBB, RB).

Thurs 20 … Office … Surface on Second copy plans (3).

Fri 21 … Office … Surface on Second copy plans (3).

Sat 22 … Office … Surface on Second copy plans (2).

Mon 24U/gOld Waterloo drift survey in pit bottom, very, very cold 3 men (WEBB, RB, CB)(a job that was not necessary on that day) …  missed the Christmas Eve Office Party and ½ day holiday.
Christmas Dec 25 and Boxing Day Wed 26 … Annual leave Thurs 27 and Fri 28
Manpower app 755 u/g, 160 s/f


Abbreviations used:
LG
or DG denotes Loader Gate or Delivery Gate.
LH denotes Left Hand Supply Gate. RH denotes Right Hand Gate, TG denotes Top Gate and BG is Bottom Gate. MG is Middle Gate. AW is Airway or Supply Gate. TG is Tail Gate, again a Supply Gate for materials.

 

 

P11 1957 A
Surveyor Surveyor's Job