Banner
Address FT Site Email CCL Info In Memory Menu Philip Individuals Search Webmaster Content Work Fionn Bob
Information and photographs submitted by subscribers are posted in good faith. If any copyright of anyone else's material is unintentionally breached, please email me


Calendar
2015 2010 2000 Time Romans Middle 1500 1600 1700 1734 1800 1830 1860 1900 1920 1930 1940 1950 1960 1970 1980 1990
My Work Diaries

Chimneys

A Unique History From My Work Diaries

Surveying Jobs

North Nottinghamshire Area from April 1967



Page - 53 -

Jul 1977

Fri 1 … Office … 6 inch negs to date. 1/5000 negs to date. 3 prints. Spill plate drawing chart for 1s PG for Peter Davies Mech Engineer.                                                                      

Sat 2 … Office … Progress plans. Wall plans. Emergency Egress negs to date. Info for spill plates relation to chocks for PD (8.12.45) 14967 tons

Mon 4 … Office … Finished negative. Working plans to Quarter end. Plus levels. Emergency Egress plans coloured. Second copy Working plans to date. Thoresby workings on flat sheet. General.

Tues 5U/gRB with John Herbert and Derek Stone … Parkgate loco circuit and Butterley bunker site, Top Hard pit bottom haulage routes and proposed vertical bunker site and materials route
Tues 5 … Office … HMI J Rushton … 10s heading and 15 men exemption, only 9 in face head RB. PG Development neg, info.
Safety play Thoresby.

Wed 6 … Office … Colouring 1/5000 Wall plans. Ken Mirfin Bevercotes (ex Surveyor at Ollerton to 1959) came re Support Rules for Dosco Side discharge loader and discuss. G Mason re PG Connection door positions. Phone J Herbert re Loco house, pit correct place, on intake side of battery charging rack. Phone JRG re position of Rapid Loading Bunker.

Thurs 7 …. Office … Colouring 3 x 1/5000 plans. Discuss PD and M Young doors in PG Connection Road.
Cricket match
Safety play Ollerton.

Fri 8 … Office … General. Cont’d with 1/5000 plans of PG. BM value. Discuss Engineers from Husband & Co re Bunker. And plans for winders. Meeting 9.30am … R Anderson…Manpower, Development Accountability RB.

Sat 9 … Office … Progress plans. Hung new Wall plans x 3. Sketch of PG layout - 14528 tons

Mon 11 … Office … Finished sketch and 12 prints and coloured for CW S. Meeting … Butterley bunker … cancelled … no pit drawing yet. Action programmes.
Parkgate Clayton steep seam rubber tyred Pony locos operational in Parkgate.

Tues 12 … Surface … JRG and Malc ? from T & CP to see Winding houses etc. Office …

Wed 13 … Visit by Sir Derek Ezra NCB Chairman plus H Merrik Spanton, John P Berry, CW S.

Lunch in Conference Room and introduced to Sir Derek … followed later by Meeting in Manager’s Office RB. Info to R Anderson Production Manager and discuss same.

Thurs 14 … Office … Info for R Anderson. Discuss same again. Info for CW S re Accountability. Sketch for G Mason U/m re Chock convergence for holidays.
Harold Hand (HH) Linesman retired … presented him with a gift. (He was a Linesman from around 1930 before being Undermanager’s measurer then rejoined Line staff when J Higginbotham became Undermanager in 1972). He never ever bought a pair of pit boots and rummaged through the pile of boots thrown out of the lockers when they were cleaned out in the pit holidays. Didn’t matter if odd sizes or one was a rubber boot !!! He always dyed his hair jet black.

Fri 15 … Colliery Rest Day … Surface … Survey of No4 Dirt tip and 8 and 9 lagoons with Kern tacheometer … 3 men (RB*, DMP, EWF).                                                     

Sat 16 … 10261 tons

Pit Holidays Mon 18 to Sat 30

Mon 18 … Surface … Survey of part of No2 Dirt tip … 4 men (RB*, DMP, EWF, JHs).

Tues 19 … Surface … Continued with Dirt tip survey … 4 men (RB*, DMP, EWF, JHs).

Wed 20 … Surface …Spot levels around all buildings in the Pit yard … 2 men (RB*, EWF).

Thurs 21 … Surface … Completed levelling around sidings etc. … 2 men (RB8, EWF).

Fri 22 … Office … General. Meeting 10am … Vertical Bunker project … R Anderson (RB) J Herbert.
Changed No1 winding drum to 20 feet dia steel … Nil Tons

Mon 25 … Surface … Levelling from Pit yard to Harrow Inn for subsidence line … 3 men (RB*, EWF, JHs).

Tues 26 … Surface … Levelling from Pit yard around Ollerton village to BMs for check …. 2 men (RB*, EWF).

Wed 27Office Calculations. Plotted No4 Dirt tip survey.

No1 winding drum installation completed

Thurs 28U/gNo1 pit bottom … theodolite … bearing of Centre line and conveyor line etc. New line established … 3 men (RB*, EWF, JHs)
HM Queen Elizabeth’s visit to Mansfield.

Fri 29 … Office … Plotting Dirt tip surveys with EWF – Nil Tons
Change of Undermanager’s districts again … Ged Mason Parkgate and Top Hard South side and Alan Goodwin Top Hard East side and North side.
NUM voluntary early retirement at 62 years of age to reduce by 1 year each year to 60. Manpower before 1,192, manpower after 1,133.

 

Aug 1977

Annual Leave … Mon 1 – Sat 13     Ingoldmells

12807 tons
10s Parkgate thirled - 14004 tons

Mon 15 … Office … Correspondence. Plotting levels for No2 Dirt tip survey.

Tues 16 … Office … Cont’d plotting contours on Dirt tip plan and inking in. Dirt tip records with Ted Hodgson. Practice Rescue Plan of South side for Bevercotes Rescue Team next Tuesday. Ted Hinde came to borrow Kern Auto level, staff and legs. Calculations PG Loco grades. Plotted PG 10s levels. Plotted 66s TH levels. Progress to date on plans.

Wed 17 … Office … Cont’d with Dirt tip plan inking in. Info to Colin? Tech Student re Winders and shafts. Discuss CW S and JH re 46s prep ventilation changes. Signed Vertical bunker plan for Derek Stone Asst Planner. Discuss JH Vertical Bunker project 13/14 ft work offsetting. Alf Evans (ex Rufford) on Boring team brought back Kern Level.

Thurs 18 … Office … Finished Dirt tip neg. Calculations. Plotting surface Pit yard and sidings levels on 1/1250 neg. SM1 Form to Manager re 66s approaching 42s AW end … signed by CW S and sent to Area HQ.
Evening at Welfare … Retirement Party for over 62s

O-Wel

Fri 19U/gNo1 pit bottom … Prep work for Vertical Bunker Road … (RB*, Eric Barton Development O/M and Ken Greaves) … then Visit to 10s PG through the face and to Loco house … Office … Discuss DM Parker re CJ Whyte visit. Discuss Jim Humphries Apprentice re his future, since failing exams. JRG brought the Invar band for standardising 50m bands.          
Evening … Devonshire Suite at Sutton, Area Finals for Safety Plays.

Sat 20 … 12163 tons
Sat 20 … Office … Progress. Levels plotted to date. Referncing a book. Check lines from Linesmen.

Mon 22 … Office … Inking in levels on new surface neg. Discuss PG Vertical bunker Road re rip with JH, CW S and GM, rip on 16 x 10 to end of cable trench.

Tues 23U/gMeasured sections along 59s face, prior to installing DERDS, face having passed through swilley2 men (RB*, DS) … Office … Sections to CW S. Survey records of 1s PG gates to RN Singh University of Nottingham re Deformation survey of roadways (RB). (350 + 6 u/g)

Wed 24 … Office … Dirt tip sections and inked in. Made new Parkgate Dirt tip Overlay. Discuss D Stone, signed 1s Following Road plan.

Thurs 25 … Office … Forms for deformation of roadways for 45s, 59s and 66s. Drew section through proposed PG Following Road access. 10s AW from 2s LG to PG Intake drift bottom … Surface … Laid out new 50m base line in Office Car park with Invar band, standardised 50m bands 4 and 5 … 3 men (RB*, DS, JHs).
Rexco boundary lease amended for No4 Dirt tip ... (RB and Peter Daffin, Area Estates).

Fri 26 … Office … Finished info for RN Singh. Phoned through and sent plan with 1s, 45s, 59s and 66s … Surface … Check measured Car park base with bands 4 and 5 and 50m Stilon in catenary. Discuss George H Jackson.

Sat 27 … Maurice Hind, Mechanical Shift Charge Engineer phoned me at home regarding check on 1s No1 conveyor drive … o.k. RB. 11641 tons

Sun 28U/gChecking 1s No1 conveyor line. Putting new line to suit conveyor in pit … (RB, Eric Barton and Fred Marples Belt mech).

Mon 29 … Late Summer Statutory Holiday

Tues 30 … Office … Discuss EWF various. General. Progress. Bevercotes team borrowed Planimeter.

Wed 31 … Office … Peter Twigg student from Royal School of Mines various.

 

Sep 1977

Thurs 1 … Office … Information for Management News re Parkgate to CW S and other past and future projects … 7 pages. Discuss CW S o.k. … Surface … Measured up large arches in stock yard for No2 pit bottom … 23 feet x 18 feet … 3 men (RB*, DMP, EWF).

Fri 2 … Office … Keith Davidson student RSM various (RB*). General. Boreholes to date on 1/25000. … Arch sizes set in all gates for J Higginbotham (RB*).

Sat 3 … Office … Road map for Boughton Nomads Jazz Band for Oct 1 (RB*) - 9102 tons

Mon 5 … Office … Student John Bowler Royal School of Mines general discuss, operations etc. (RB*)

Tues 6 … Office … Student from Worksop at Hull University … general info (RB*).

Wed 7 … Office … General. Correspondence. Surface … Measuring to various buildings and screens demolition … 3men (RB*, DMP, EWF) … Office … Monthly meeting Accountability, Manpower Savings and Development … R Anderson (RB).

Thurs 8 … Office … Sorted out various catalogues and books. John Herbert on phone. Sorting through old Pit bottom plans. Checking levels etc. JRG various.

Fri 9 … Office … Sketches and info for panels for CW S re HM Spanton visit next Monday. Discuss HMI J Jones and Loco circuits sketches (RB*). Gordon Weeks Asst U/m phoned re 46s thirling. Discuss G Mason U/m 1s AW end and 2 sketches for a Temporary stable hole and change of supports. Discuss AV Goodwin U/m boreholes at 66s. Discuss JH and AVG and sketch of 59s against 58s bad ground.

Sat 10 … Top Hard 46s LG thirled to face 9am … o.k. - 12275 tons

Mon 12 … Office … Info CW S and discuss. J Herbert re ATT finished. Fred Marples conveyors. Sorting out 1s theodolite survey and discuss? Phone JRG. Weighing machines conversions to metric … grams and kilos for Admin department.

Tues 13 … Office … Fred Marples re conveyors again. Phone JRG again. R & FF amends for 46s LG thirl to face and ventilation change. Discuss E Gillfillan ATT re Butterley Bunker.

Wed 14 … Office … General. Boreholes to date on plans. Old working papers. J Clapperton Dep Elec and info to P Noone Dep Elec. Discuss JH and GM 46s LG set up. Discuss T Grainger Projects Planner. Butterley Bunker vibro pit and also vertical Bunker project. Bernard Charles Area Safety department re accident on Parkgate No1 conveyor platform (RB).

Thurs 15U/g … Visit to No 1 pit bottom Vertical bunker Road measured large fall of roof, came in solid. Also to 26s LG borehole position 66s panel (RB) … Office … Discuss S Lunnon various to date with geology info for all panels. British Rail Surveyor came for workings to date (RB).

Fri 16 … Office … Drew out 46s LG entrance. Parkgate Meeting 10am … R Anderson (RB). HMI J Jones … 1s LG method of work with Dosco … coming next Monday. Phone JRG re staff members. Discuss J Herbert re PG. Discuss T Grainger Vertical bunker top and bottom and Junctions, with plans for first time.

Sat 17 … Office … Progress. Wall plans. Electrical plan info to date with Colin Waller (Crash) Elec Charge Engineer. Amendment plan for 46s thirling put in Rescue Room next to Lamp Cabin. Discuss Sean ? Surveyor for Henry Boot re No1 Winding house setting out - 12698 tons

Mon 19 … Office …Plans of proposed Support Rules amends at 1s AW end to JH and HMI GH Thomas and HMI J Jones. Phone George H Jackson Asst Area Surveyor re PDI draft re plan amendments. 1s AW Support Ruleson Ozaloft and 2 copies to HMI. 6 sketches of same to G Mason U/m.

Tues 20 … U/gSorted out conveyor line for 46s LG … 1.1m offset from centre of conveyor … 4 men (RB*, DS, MJ, RC) … Office … Coloured 2 copies of Dirt tip plan.
Tues 20 … U/g again … Measured up accident at 66s LG Bishop Pack area re a broken panzer chain … 4pm - 8pm. (RB*, EWF). (20)

Wed 21 … Office … Continued with Borehole info on 1/25000 sheet and depths etc. Eric Barton O/m re Pit bottom Turn Junction. Meeting … Ollerton Conference room. George H Jackson Assistant Area Surveyor, Des Thompson Harworth, John Eyre Blidworth, Graham Hall Bevercotes, RB Ollerton … New draft PI Instructions re 24 hours replacement of Rescue and Fire-fighting plans.

Thurs 22 … Office … Ventilation negs to date. Plotted side boreholes at 66s. Discuss info with Tony Tryner and D Lawson re proposed TH South side stoppings sites. Phone Cliff Johnson Area Method Study Engineer re Dirt conveyor. SN Whittle phoned for info. At HQ Civil Engineers and Finance to new offices.

Fri 23 … Surface … Line of sight for proposed conveyor from Dirt bunker to sidings … (RB with EWF and Derek Underhill Method study) … Calculations of extra 2 years life of tip extension using same ! Colouring Ventilation plans. D Stone discuss. Yugal K Verma MRDE re boreholes with plan and temperatures underground.

Sat 24 … 12575 tons

Mon 26 … Office … Completed Water Pollution neg. Phone CJ Whyte re any sewage into system to report same. Info to Ted Hodgson re same. Discuss D Lawson re temperatures underground. Info to Method Study re 59s AW paddy extension.

Tues 27 …Office … Valve info amends. Cost department re tonnages. Meeting Butterley Bunker project … R Anderson Production Manager. Calculated 59s survey.

Wed 28 … Office … Water Pollution Prevention plans. Script with JR Greasley and R Sivell Group Costs. Discuss JRG re 2s Subsidence plan. HMI J Jones and J Higginbotham re 1s AW end Support Rules amendments. Discuss D Lawson Safety Engineer. Discuss Steve Lunnon Geologist.

Thurs 29 … Completed files for Water Pollution Prevention Report. Phone Peter Robinson Rufford re piano wire and proposed visit to Bunker. CW S signed Dirt tip record … Surface to see new Dowty packing table for 10s … (RB, EWF, DS).
Thurs 29 … Rffice … Job appraisal of Eric Fretwell (EWF) by me. AV Goodwin U/m re 46s LG end, sketch of chocks.

Fri 30 … Office … Discuss EW Fretwell old workings etc. General. Discuss Richard ? re drains. Progress.
Parkgate 1s AW paddy operational - 13024 tons

 

Oct 1977

Sat 1 … Office … Progress. Wall plans. Notice for 1s AW Paddy times.

Mon 3 … Office … Discuss D Lawson Packing Table. And modular gearbox supports. Plotted surveys to date. R Sivel Group Costs re Pollution report, 3 copies. Write up of Information of Parkgate development re CW S visit to Long Benton NE.

Tues 4 …. Office … Job appraisal by CW Standage3 *. HMI J Jones re wrong amendments sent for 1s AW Support Rules. Altered same and checked by D Lawson and sent 4 copies. CW S re DM Parker Deputy Surveyor Appraisal. CW S re Pit bottom Vertical Bunker and inventory for whole of Top Hard seam.
D Mike Parker (DMP) Job appraisal by me.

Wed 5U/gTheodolite survey No1 Pit bottom and new line for 13/14 ft arches and grade line … 5 men (RB*, DMP, EWF, DS, JHs). Then marked centre line of delivery conveyor from Sutcliffe Bunker2 men (RB*, DS) … Office … Sorting out survey. Phone SNW re organisation of new cabinet. (365 + 6 u/g)

Thurs 6 … Office … Slides construction. Info to CW S re fencing of ponds etc. Discuss Tommy Partridge Deputy. Trevor Brown Deputy Pit bottom re line lads!

Fri 7 … Office … General. Phone AVG. Meeting … Accountability, Manpower Savings and Development … R Anderson. Discuss D Stone. Discuss Terry Jones, District Manager for Dowty and 2 Reps problems with 10s Aw proposed Packing table with modular AFC gearbox. Discuss CW S and GM re same. Info to P Davies. Phone JRG re Printing machine, condition etc. Negative of PG layout to Area HQ for 6 slides. Progress.                                                                                           

Sat 8 … 13312 tons

Mon 10 … Office … Slides for CW S and info for Long Benton course. Eric Ricketts PPM re all plant in Top Hard for inventory. JH re 10s Support Rules for using a Packing Table.

Tues 11… Office … Phone Des Thompson Harworth and Peter Robinson re visit to see Rufford Bunker. Peter Downing Deputy Civil Engineer re Surface Fire fighting tank etc. and discuss Method Study Gerry Norris re all info for 1s, 2s, 10s Parkgate and 46s, 59s, 66s Top Hard for possible Incentive scheme. G Mason and Dowty Rep re 10s AW Packing Table Support Rules. CW S and JH re same.

Wed 12 … Office … General. Plan. Discuss Fred Marples conveyors. HMI J Rushton re info for Parkgate Return drift.

Thurs 13 … Office … Phone Staff department re Smokeless fuel and loan. General. JRG and Civil Engineer from Husbands Co re Winding house bricks. 2 new Levelling staff tape replacements exchanged for the ones sent that had an error.

Fri 14 … Visit to Mining Exhibition at Birmingham NEC bus from Mansfield Colliery 8.30am (Terry Jones, Dowty and Jimmy Sterland, Dosco hospitality).

Sat 15 … Office … Progress. Wall plans. Surface … Set up lines etc. for supports for Dowty packing table for Reps (RB*, DS, KW) - 13003 tons - Bought a 1975 Morris Princess 2.2, Brown

Mon 17 … Office … General. Fred Marples re 1s No2 and Vertical Bunker conveyor and stage loader. Leaflets from Exhibition. Vertical Bunker drawings … Surface … Dowty Packing Table set up.

Tues 18 … U/gVisit to Rufford Colliery with Peter Robinson, Surveyor, Des Thompson, Harworth, RB Ollerton to 400 tons Butterley Bunker in old Top Hard Loco Road … various measures.

Wed 19 … Office … Discuss various. Butterley Bunker setting out and Vertical bunker plans. Drawing out Auxiliary Ventilation plans for 2s LG and face development and also for Vertical bunker.

Thurs 20 … Surface … Sorting out pump range from No2 shaft. Also Frank Lee Area Planning Engineer re various. General. Terry Jones Dowty Rep.

Fri 21U/gVisit to Welbeck Colliery RB with J Higginbotham and Terry Jones Dowty Rep to 79s Top Hard Dowty Ripping and Packing table at AW and ‘In line’ gearbox and modular at LG with Dosco side discharge. Discuss with Manager, Deputy Manager and Undermanager … Office … Discuss JRG. Updating Second copy plans.
13014 tons
Jim Humphries (JHs) left the job. Ian Orgill (IO) started as Apprentice. Paula L Lesh left for confinement. Steve T Barnes qualified.

Sat 29 … Office .. Sorting out measurements for Incentive scheme.

Annual Leave 1 Week Mon 24 – Sat 29

12001 tons

Mon 31 … Office … General. Discuss work. Discuss Ian Orgill new Apprentice.

 

Nov 1977

Tues 1U/gChecked Vertical Bunker pit excavation and 1s No2 conveyor drive house, 2s LG Junction check and 10s face, then Loco house cracks ! (RB*, DS, Ian Orgill IO) … Office … Plotted 66s abandonment survey and levels.

Wed 2 … Office … Stippling plans and also levels to date. Surface … Dirt tip inspection with Mike Dale, M Turner JR Greasley, RB

Thurs 3 … Office … General. First ECP Rep Glyn Jones info Vertical Bunker for proposed powder. Sketches and haulages info to P Davies for 1s, 10s, 46s and 600s. 59s levels. Shotfiring patterns from Colin Wynne ICI Rep with IO. Eric Ricketts PPM brought all info for Top Hard inventory.

Fri 4U/gVertical Bunker Road through to Loco Road. 26s downbore completed. (RB*) … Office … General.

Sat 5 … Office … Progress - 14904 tons

Mon 7 … Office … Inventory of Top Hard equipment, checking through PPM sheets. Gordon Ison Senior Surveyor re Liz Munnings Tracer from Welbeck to help.

Tues 8U/gto 46s panel, 20s paddy stop then back up East side. Level line for chocks at Vertical bunker Junction with old Loco Road … 3 men (RB*, DS, IO) … Office … Discuss John Faben, Mechanisation.                                                                           
HMI K Couldwell visit to Rescue Room adjacent to Lamp Cabin with JJ Street Rescue Station Manager

Wed 9 … Annual Leave

Thurs 10 … Office … Showing Liz Munnings various and routine. Amends to various sketches for 10s face. Conference booklets.

Fri 11 … Office … Discuss D Lawson Temporary stable holes, shotfiring. … Monthly Meeting … 3pm Accountability, Manpower savings, development … R Anderson (RB). Phone Keith Jenkins Thoresby re 100s PG faulting. Sam Dunlop Group Mechanical re fencing on the premises.             

Sat 12 … 16107 tons

Mon 14 … Office … Continued with Support Rules for 10s Face Conference file and prints. TH Inventory with Dougie Stockham. Shotfiring pattern for temporary Stable hole with Colin Wynne ICI Rep. Tuition to Ian Orgill Apprentice.

Tues 15 … Office … Info to CW S re chocks for 10s … 205 line chocks plus 4 AW buttress plus 2 back beams LG plus 1 anchor chock LG plus 9 In seam AW end = 216 line + 9. Tuition to IO. DS re TH Inventory. Discuss D Lawson ventilation. Also 1s AW supports for Slusher packing … CW S, JH, GM – RF re changing supports at 46s AW end … 6pm.

Wed 16 … Office … Sorting out 1s AW end supports with DMP and EWf. Phone Jim Turner, Deputy re Vertical Bunker Junction chocks to alter. Also KF Greaves. Discuss GM supports. Plan. General. Mr Lewis Rep from Clarksons demo with new tape. Took a dial back for service.
Planning department at Area HQ moved offices.

Thurs 17 … Office … Tuition to IO. Plan. Sorted out plan drawers with EWF. Phoned Jim Turner re Juction … CW S says not to alter. Set of various plans for Brian Stones (ex Teversal Ventilation Officer) Lecturer at Worksop Technical College.

Fri 18 … Office … Tuition to Ian Orgill on dial and calculations using log tables.                 
M & Q Act 204 change of HMI to Dilwyn Richards, Worksop Office, Potter Sreet.

Sat 19 … Office … Progress. Info re cables to Colin Waller Elec Shift charge Engineer. 13239 tons

Mon 21U/gVisit to 1s panel, measurements to 2 feet fault, down to right at LG, 1,950m. Check on 1s No2 conveyor installation and 1s No1 tension etc. Extended 1in8 grade line at Butterley bunker vibro pit and checked Juntion at old Loco Road (RB*)
Liz Munnings from Welbeck temp Tracer to help occasionally.

Tues 22 … U/g … with David Muller Geologst to 1s LG fault. Discuss same G Mason U/m … Office … Discuss DM re Geology of Ollerton. Discuss JH re Vibro pit and platform across gate? (370 + 8 u/g)

Wed 23 … Office … Plotted same and Geological folder to date. Table plan prints for Police Inspector Hall, Worksop. Phone Derek Stone re 1s fault.

Thurs 24 … Office … Constructing PG sheets SK6665 and SK6866, plus surface and stencilling.

Fri 25 … Office … To Thoresby. Continued with plans. Phone JRG and DW Thorpe. Discuss CW S 1s fault. Discuss KF Greaves. Discuss R Sivel Group Costs re Water Pollution plans. 16 required.    

Sat 26 … 16295 tons

Mon 28 …Office … Office … Colouring Water Pollution Control plans. JRG called for negative. Ken Mirfin, Bevercotes sent an Engineering Drawing Table, spare from Area HQ. Info to CW S re HMI D Richards, Principal and J Jones District HMI visit tomorrow re Support Rules (RB). Colouring 4 prints for P Davies Mech Engineer general layout of PG. Meeting … 4pm … R Anderson … Thyssens staff and work to do (RB). RA and CW s general talk etc. Jack Lyons tuition on New Office Dictograph, internal office calls.

Tues 29 … Office … Continued colouring Water Pollution plans. Frank Lee Area Plaanner discuss.

Wed 30 … Office … Continued. BT Bailey Civil Engineer Dirt tips phoned re drains position and amount of flow past Slaney’s yard, referred him to Ted Hodgson Surface Superintendent. R Anderson re planning new Office accommodation (RB). To Area HQ … with Surface neg. John Herbert phone re Surface Strategic amends.

 

Dec 1977

Thurs 1 … Office … Continued with Surface plans for Water pollution prevention. Planning out new offices.

Fri 2 … Office … Pioneered Water Pollution Prevention plans … example for Area (RB) … 16 copies and folders to Hobart House. R Sivel Group Costs re same. Drawing out proposed office changes, Tom Grainger discuss various and PG contours for Stage II. Discuss Steve WH Lindsay Cost Clerk re proposed Incentive Scheeme and CW S. Discuss J Herbert and D Stone planning PG. Discuss DMP and EWF Butterley Bunker.

Sat 3 … Office … Progress. Measured up for proposed Incentive Scheme -  14576 tons

Set up Office Dictograph system.

Mon 5U/gLevelling etc. for setting out Butterley bunker grades and checks … 3 men (RB*, EWF, IO) … Office … Calculations. CW S re 46s sections. Sorting out info for Vertical Bunker survey. Discuss Alf Evans.

Tues 6U/gTheodolite check survey for Vertical bunker … 6 men (RB*, EWF, DS, IO, KP, RC) … Office … Calculations. Phone R Sivel Group Costs he required 2 more copies of Water Pollution Prevention plans for Area HQ Committee. Colouring same.

Wed 7 … Office … Surface Strategic Plan amends with CW S. Also J Lyons, J Clapperton Elec and P Davies Mech discuss. G Fryer Civil Engineer re drains. John Hickling Sprecial duties Mech Engineer re Butterley Bunker. Tom Pallant phoned re new Boiler house. Amends to plan.

Thurs 8 … Office … Discuss AV Goodwin re 46s face sections. Continued with amends and additions to Surface 1/500 Strategic plan. HMI J Rushton re 2s shotfiring patterns and Support Rules for temporary Stable hole (RB). Info from JL and PD re Surface Strategic plan.

Fri 9 … Office … General. Sorting out panel advances. Discuss J Herbert Surface Strategic plan. Info from Stores and info from Ted Hodgson.                                                                   

Sat 10 … 16741 tons

Mon 12 … Measurements for Incentive Scheme pay … Linesmen’s measurements against Deputy’sto measure in metres in future … not yards, feet and inches … RB to CW S and JH. Same with Benny Wells Time / Wages, Steve WH Lindsay Costs, AV Goodwin U/m and G Mason U/m. T Grainger re top of Vertical Bunker.
Mon 12U/gMeasures for Loco accident at 10s AW Junction with Connection Road … 6.30pm – 10.30pm (RB*) (21) (375 + 8 u/g)

Tues 13 … Office … Drawing out accident plan. Plan to R Raynor. Meeting 2pm … Surface Strategic Plan … R Anderson. Discuss J Herbert and D Stone. Phone George H Jackson re PDI. Discuss CW S and JH re PDI 1977/7. Updating R & FF plans.

Wed 14 …Office … Completed accident plan. Info to HMI J Rushton re accident (RB). Discuss CW S and JH. Saw Bill Tilstone NACODS Pres re proposed sheets. Phone Des Thompson Harworth re same.

Thurs 15 … Office … Discuss D Lawson and EWF. Info and sheets re Deputy’s Office for weekend measurements. Phone CJ Whyte re PDI on R & FF info. Ken Mirfin Bevercotes phoned re 2 Undermanagers plan. Info to P Davies re 46s. Amendments to Ventilation plan and R & FF neg.

Fri 16 … Office … General. Discuss E Gillfillan ATT. Plan of Drapers Paddy. Visit to surface and winding house, plus other buildings and discuss (RB withFrank Lee, Area Planning Engineer). Discuss KFG. Amends to R & FF plans and Ventilation plans.
Fri 16 … U/gMeasured up accident to J Lapko on 10s face … (RB*) (22) 6 pm – 10.15pm (360 + 7 u/g)

Sat 17 … Office … Progress. Incentive measurements and check by Deputies - 16248 tons
Sat 17U/gMeasurements for accident to R Phipps at 600 tons Sutcliffe Bunker 8.15am – 1.15pm (RB*) (23) (375 + 8 u/g)

Mon 19 … Office … Accident plan for J Lapko 10s face, Info to Ron Pye, Area Safety (ex Thoresby, to Doncaster HQ) , re same. Prints to CW S. Phoned Surveyor at Manton, S Yorks Area re escapsulating plans and notices.

Tues 20 … Office … Amends to D/m R & FF plans and negs. Phone Ken Mirfin Bevercotes. Discuss Bernard Charles Area Safety. HMI J Rushton re accident to R Phipps at Bunker (RB), amends to same. And prints. Deputy’s cabin, measurements sheets. Butterley Bunker lines finished and piano wire.

Wed 21 … Office … Accident plan copies. 66s stopping, amend on R & FF plan and Ventilation.

Thurs 22 … Office … 6 inch plans to date (1/1056o). NUM Consultative Meeting and Party (RB)
Survey department moved into new upstairs office at Area HQ.

Fri 23 … Office … Amends to R & FF plans. General.                                              

Sat 24 … 15651 tons

Sun 25 … Christmas … Mon 26 … Boxing Day

66s TH East side district stopped off.
David Lawson Safety Engineer left and went back to Parsonage Colliery, Lancs.

Mon 26, Tues 27 … Statutory Holiday, Wed 28, Thurs 29 and Fri 30 Colliery Rest Days Nil

Output 1977 = 629,338 tons 1157 men on books


Abbreviations used:
LG
or DG denotes Loader Gate or Delivery Gate.
LH denotes Left Hand Supply Gate. RH denotes Right Hand Gate, TG denotes Top Gate and BG is Bottom Gate. MG is Middle Gate. AW is Airway or Supply Gate. TG is Tail Gate, again a Supply Gate for materials.

 

 